Call Us For Enquiry +974 44114892 .      
  • slide 1
    ANY DESIGNS: Cost Effective : Fast & Easy Construction Reduces Cooling Cost
  • slide 2
    ANY PROJECTS: Durable: ICF envelop acts as weather barrier
  • slide 3
    STRENGTH: & SAFETY Storm, Seismic Force, Blast & Fire Resistant
  • slide 4
    VERSATILE: 5 in 1 System : Structural Wall, Insulation, Air Barrier, Vapor Retarder, Furring
  • slide 5
    UNIQUENESS: Build Different, Build Better
  • slide 6
    ANY FINISHING: Aesthetics is your choice
  • slide 7
    COMFORT: Indoor Air Quality, Sound Attenuation, Moisture Control, Thermal Insulation
  • slide 8
    PRODUCTS: IFORM, Insugreen, Decolite
  • slide 9
    IFORM: Various IFORM designs
  • slide 10
    IFORM: Various IFORM designs
COMMERCIAL GALLERY
PELICAN BEACH RESORT
LocationFt. Lauderdale, Florida
Area200,000 sq ft
ContractorParlin Properties and Development, Inc
Completion
×

PELICAN BEACH RESORT

LocationFt. Lauderdale, Florida
Area200,000 sq ft
ContractorParlin Properties and Development, Inc
Completion
Details9" and 11" iForm Eleven(11) stories over underground parking level. 125,000 air conditioned square feet . Hardie Board fibercement siding and stucco exterior finish, Old Florida Victorian style Standing seam roof,300-ton HVAC.
 
  • slide 1
FAIR FIELD INN (MARRIOT)
LocationWilliamsport, Pennsylvania
Area31,000 sq ft
ContractorRocky Mountain Homes – Williamsport
CompletionFeb. 2005
×

FAIR FIELD INN (MARRIOT)

LocationWilliamsport, Pennsylvania
Area31,000 sq ft
ContractorRocky Mountain Homes – Williamsport
CompletionFeb. 2005
DetailsThree (3) stories , 11" iforms used Dryvit acrylic stucco exterior finish, Fiberglass shingles Started in November 2004-finished in February 2005
 
  • slide 1
HAMPTON INN
LocationOneonta, New York
Area42,632 sq ft
ContractorPicarazzi Building Products, New York
Completion
×

HAMPTON INN

LocationOneonta, New York
Area42,632 sq ft
ContractorPicarazzi Building Products, New York
Completion
DetailsFour (4) stories plus parapet, 11" iForm, Reward load-bearing exterior walls, Reward load-bearing interior sound walls. EIFS exterior finish,Single ply rubber roof membrane ICF pool enclosure
 
  • slide 1
MARRIOTT EXHIBIT HALL
LocationTampa, Florida
Area49,000 sq ft
ContractorHunt Construction Group – Tampa
Completion
×

MARRIOTT EXHIBIT HALL

LocationTampa, Florida
Area49,000 sq ft
ContractorHunt Construction Group – Tampa
Completion
Details15" iForm , Six (6) weeks total ICF installation time. 46 and 54 High Walls Main Exhibit Hall and Two Peripheral Buildings. Approximately 29,000 Square Feet of ICF Walls Finished to match the Spanish exterior of the original hotel
 
  • slide 1
OGDEN 13 MULTIPLEX THEATER
LocationTampa, Florida
Area95,300sq ft
ContractorSahara, Inc. – West Bountiful, Utah
Completion
×

OGDEN 13 MULTIPLEX THEATER

LocationTampa, Florida
Area95,300sq ft
ContractorSahara, Inc. – West Bountiful, Utah
Completion
Details13 Theaters – Four convert to conference rooms , Exterior made of Petrarch Panels A part of the Downtown Ogden Redevelopment Project. 13" and 15" iForm
 
  • slide 1
20 MEGPLEX MULTIPLEX THEATER
LocationSouth Jordan, Utah
Area185000 sq ft
ContractorSahara, Inc. West Bountiful, Utah
CompletionApril 2006
×

20 MEGPLEX MULTIPLEX THEATER

LocationSouth Jordan, Utah
Area185000 sq ft
ContractorSahara, Inc. West Bountiful, Utah
CompletionApril 2006
Details190,000 sq ft of ICF walls, 20 THX certifiable stadium seating theaters. 8 of the theaters have modifications that allow them to double as conference auditoriums, Each theater is a fully-enclosed in ICF walls, Large food court area ,meeting rooms. 13" and 15" iForm
 
  • slide 1
ARMED FORCES RESERVE CENTER
LocationPinellas Park, Florida
Area140,000 sq ft
ContractorHunt Construction Group
Completion
×

ARMED FORCES RESERVE CENTER

LocationPinellas Park, Florida
Area140,000 sq ft
ContractorHunt Construction Group
Completion
DetailsThree Buildings, 44 ½ Foot High Walls Center Building, 18Foot High Walls Peripheral Buildings, ICF Synthetic Exterior Coating, Selected ICF — iForm
 
  • slide 1
BUCKEYE VALLEY FIRE DISTRICT 326
LocationBuckeye, AZ
Area18,000 sq ft
ContractorCore Construction
Completion
×

BUCKEYE VALLEY FIRE DISTRICT 326

LocationBuckeye, AZ
Area18,000 sq ft
ContractorCore Construction
Completion
DetailsICFs used as interior walls, LEED Gold Certification Energy performance outperforming ASHRAE standards by 40% Energy performance outperforming pre-construction energy models by 21% Structural insulated panels used for roof. Came in $200k under budget. Finished 3 weeks ahead of schedule
 
  • slide 1
UNIVERSITY OF MEMPHIS LIVING AND LEARNING CENTER
LocationMemphis, TN
Area60,000 sq ft
ContractorFlint Co.
Completion
×

UNIVERSITY OF MEMPHIS LIVING AND LEARNING CENTER

LocationMemphis, TN
Area60,000 sq ft
ContractorFlint Co.
Completion
DetailsAbout 13,000 ICFs Used. 13? iForm, 2 Buildings .Variable refrigerant flow. Heat recovery units . ICFs helped to meet the seismic codes- Memphis sits in a seismic zone 3
 
  • slide 1
ALAMOSA K-2 AND K-5 SCHOOLS
LocationAlamosa, CO
Area140,000 sq ft
ContractorThe Neenan Co.
Completion
×

ALAMOSA K-2 AND K-5 SCHOOLS

LocationAlamosa, CO
Area140,000 sq ft
ContractorThe Neenan Co.
Completion
DetailsBoth schools built identically, 13" and 15" iForm, 11,000 ICFs used, LEED Gold Certified. Photovoltaic system for Hot Water. Hydronic underslab heat, Funded by Colorados BEST program, Energy modeling showed a 72% reduction in heating costs.
 
  • slide 1
SURREY GRAND CROWNE
LocationBranson, Missouri
Area51,308 sq ft
ContractorGreg Walker, WCI, Inc
Completion
×

SURREY GRAND CROWNE

LocationBranson, Missouri
Area51,308 sq ft
ContractorGreg Walker, WCI, Inc
Completion
Details11" iForm , Five stories plus basement, Acrylic stucco exterior finish material, Composition shingles over Chem-Steel roof. 1 ½ ton to 3-ton HVAC, 5 ½ composite concrete floors spanning approximately 15
 
  • slide 1
E2 CITY HOMES
LocationMinneapolis
Area 12376 sq ft
Contractor
Completion
×

E2 CITY HOMES

LocationMinneapolis
Area 12376 sq ft
Contractor
Completion
DetailsBoth schools built identically, 13" and 15" iForm, 11,000 ICFs used, LEED Gold Certified. Photovoltaic system for Hot Water. Hydronic underslab heat, Funded by Colorados BEST program, Energy modeling showed a 72% reduction in heating costs.
 
  • slide 1